Dholera Activation Area
The proposed Industrial Park called as “Activation Area” is spread across an area of around 22.5 sqkm within Town Planning Scheme 2 in Dholera SIR. The area has approximately 72kms of roads and has an optimum mix of land uses comprising of industrial, residential, mixed use, recreation, and tourism. The area has been selected based on immediate availability of land and its future status after implementation of TP scheme (area with highest opportunity of commencement of site work). The area has existing connectivity to SH6 via the Coastal Road in the north of the site. To develop the Activation area various trunk infrastructure projects have been identified as listed below:
1.Roads & Utility Services – 72 km
2.Flood Management – River training and bunding on Adhiya river – 15 km
3.Potable Water Supply – 135 km
4.Waste Water Treatment (STP & CETP) – STP 20MLD – CETP 35MLD
5.Solid Waste Management – 22.5 sqkm
6.Power Infrastructure – 430MW
7.Information and Communication Technology (ICT) – 22.5sqkm
8.Administrative and Business Centre for Dholera (ABCD Phase-I)- 14000 sqm Built-up